Product 2/8

Opening and Closing Package

New
Opening and Closing Package
  • Model: 7

$750.00

Item is in stock
Pool Opening: Assembling and starting pool/spa pump and equipment Re-installation on ladders and hand rails Vacuuming swimming pool interior up to 1 hour Blowing deck area around the pool/spa Removing , cleaning and folding cover Water test, Start up Chemicals included Shock, DE powder included Checking water circulation for adequate flow Visually Inspecting Pump, Filter, and Heater for Proper Operations and report Bringing the water level up to normal. Pool Closing: Lowering Water Level Air Blowing Lines Winterizing Pump and Filters Supplying and Applying Winter Chemicals Installing All Inlet and Outlet Plugs Removing All Pool Equipment-Hand Rails, Ladders and Diving Boards Installing Owner's Pool Cover